kingdom of saudi arabia

This turn-key installation was completed for one of the largest poultry producers in the Kingdom of Saudi Arabia. 36 x 60,000 bird layer cage houses and 12 x 60,000 bird rearing houses were built over a 2-year time frame.

8 phases of 6 houses were completed by a multi-skilled team, led by an experienced project manager, alongside eight highly qualified European supervisors, 25 skilled European mechanical and electrical tradesmen, 65 talented workers and a crucial support team of cooks, drivers and store specialists.

GREAT BRITAIN

Working for the UK’s largest free range egg producers, we have completed more than 15 projects.

Especially notable is a two level 100,000 bird barn unit, successfully completed within 10 weeks. Furthermore, we have successfully completed numerous projects, including the installation of layer cages, rearing cages, barns, broilers, broiler breeders and free-range houses.

IRELAND

Successful delivery and installation of 3 x 150,000 bird layer cages and three manure drying systems completed for one of Ireland’s largest egg producers.

Each house was successfully installed within a nine-week time frame.

This project involved a large, multi-skilled team led by an experienced project manager, along with a European supervisor.

Industrial Factories

INDUSTRIAL UNIT
Design and build of 6 no industrial units to add to our own property portfolio
From conception to gaining planning permission, detailed design drawings
Completion of all civil engineering and groundworks
Portal frame insulated units over 10,000sq ft of valuable industrial space delivered

office spaces

Acquisition and refurbishment of a 5000sqft industrial unit to provide
3000 sqft of office space over 2 floors and a remaining 3500sqft of warehouse
The building being a 1970s construction required full insulation upgrade implementation of heating and full rewire
Re-clad with composite panels

Residential

Design and build of 2 no residential flats
Taking a small plot of land and carrying out a design to maximise use on the land
Building within a Victorian town brought its challenges, but the group rose to the challenge
The landlord has gone on to create 2 successful holiday lets in the units

Client Mr.B

Successful installation of full environment control ventilation system for a commercial spray shop

A turnkey install of over 375m of ventilation ducts from incoming supply air to extraction along with appropriate air conditioning units

Customer comment (HL team arrived on time carried out the work in a professional manor completed within our tight timeframe)

Client Mr.C

Installation of over 600m of environmental control ducting ranging from 200mm to 750mm diameter to service 6 adjoining poultry buildings

Two external heat exchangers providing the livestock with incoming temperature controlled clean air
The system was designed to reduce on farm heating costs by up to 60%

Client mr.s

Installation of ducting and air conditioning unit to a building containing 2 shops and 2 flats above

All ducting installed with internal air vents to the customers requirements

Designed by one of our major clients we carried out the complete install including making good to the properties

The properties now benefit from a temperature controlled environment and lower energy costs

Commercial SOLAR

Solar air collectors installed in Germany

Project involved the connection of 400m2 of PV panels with process air technology.

This included a ventilation system.